PANIK cover image

Medway, United Kingdom

18 years on the decks. Delivering weekly 2.5-hour Tech House deployments focused on rolling basslines and high-energy underground vibes.

🛰️ System Status: Phase 5 [APEX] 🔵
📅 Schedule: Weekly live signals (Wed/Thu/Fri).

Consistency Over Everything.

Posts

IMPORTANT NOTICE: Stream Hiatus, Schedule Update & July 3rd Event

No live streams June 19 & 26 as I focus on onboarding for my new job! We’re back July 3rd for a soft launch—I'm recording my set at the Thumb Dance event & dropping it with a fresh visualiser on YT/Mixcloud. Live schedule updates soon! 🙏

0

📡 [SYSTEM ANOMALY REPORT: ORBIT-002 // RE-ROUTING DATA RECOVERY]

🚨 SYSTEM NOTICE: Orbit-002 hit heavy tech turbulence tonight (deck connection drops, Mixcloud crash & OBS shutdown lag). The mix itself was an absolute blast though! Full un-corrupted audio/video VOD upload tomorrow after some rest. 🛸

0

📡 [LOG ENTRY: ORBIT-002 // EMERALD SECTOR ENGAGED]

🚨 SYSTEM NOTICE: Mainframe reset complete. Corrupted driver matrix rebuilt, Serato UI upgraded, and pre-flight 2-hour stress test cleared. The console is running ice-cold. Green Week is a GO. Orbit-002 launches Friday 17:00 BST. 🛸

0

TECH HOUSE LIVE | Phase 06: ORBIT-001 [Crimson Sector Mix]

Mainframe repaired, thermal paste fresh, and core stable. Phase 05 is offline—Phase 06 is cleared for departure. Tomorrow at 17:00 BST, we dive deep into the Crimson Sector. Lock your telemetry. Countdown active! 🔴🚀🎛️

0

Tech House Live | APEX-008 [THE FINALE] | Friday 29th May @ 17:00 BST

[APEX-008 // FINALE] FRI 29.05 @ 17:00 BST. The peak was never the destination. We are on board Spaceship APEX and the ground is falling away. Unthrottled Tech House & Bassline. Next stop: [ ORBIT ] 🚀

0

APEX-007 // THE PINK PHASE: NETWORK PULSE [7/8] 📡💖

🛰️ APEX-007 [PINK]. New Friday slot! Live tomorrow (22nd May 2026) 17:00 BST. Mainframe upgraded. 💖📡

0

🛰️ APEX-006 // MISSION STATUS: RECALIBRATING [6/8] 🔵

APEX-006 - NEW TRANSMISSION COORDINATES: 📅 FRIDAY 15.05.26 🕔 17:00 BST TECHNICAL DATA:

0

🛰️ APEX-006 // MISSION: APEX-006 [6/8] 🔵

🛰️ APEX-006 // 2.5H Live Tomorrow (14th) 17:00 BST. Cryo-Stability engaged. 🔵📡

0

🛰️ SYSTEM UPDATE // APEX-005 [ORANGE PHASE]

SYSTEM STATUS: ORANGE. 🟠 APEX-005 ignition begins 7th May 2026 @ 17:00 BST. Thermal Sync locked.

0

MISSION CONTROL: APEX-004 INITIALISATION | DEPLOYMENT DATE: 30.04.26

SYSTEM STATUS: PURPLE. 🟣 APEX-004 launches tomorrow at 17:00. Lock in the signal frequency.

0